Our solution stands out from those currently in use primarily in the following aspects:

  • the possibility of delivering a turnout with factory-integrated steel elements in key areas, particularly within the switch zone,

  • achieving high initial quality thanks to production under controlled conditions at the prefabrication facility,

  • a properly designed drainage system enabling efficient water discharge,

  • improved maintenance processes through the optimization of steel components — including the use of extended steel infill elements in narrow spaces between rails,

  • a significant reduction in installation time, down to as little as 72 hours.